Add listing Log in

Complex Emerald Safir

Emerald Safir is a new luxury residential complex with all amenities in the popular area of Mesitli in Mersin, 700 m from the sea and the beach.
ID: 4937

Complex parameters

Stage of construction
construction
Levels totally
14
Destination to the sea
700 m

Detailed description

Emerald Safir is a new luxury residential complex with all amenities, located in the Teje neighborhood in the most popular area of Mersin - Mezitli, close to all necessary infrastructure, at a distance of 700 m from the sea and the beach.

The complex is located on a plot of 4,832 square meters. m., consists of one residential block of 14 floors, each of which houses 12 apartments of layouts 1 +1 and 2+1. Every detail of the apartments is carefully thought out, they are all sold with high-quality finishes, and the kitchen and bathrooms are equipped with the latest technology.

Apartment sizes:

  • 1+1 - from 55 sq. m.
  • 2+1 - from 70 sq. m.

Apartment equipment:

  • Steel entrance door
  • PVC windows
  • The walls are painted with waterproof paint
  • Parquet with joints of 8 mm
  • Modern interior doors
  • Wardrobe
  • Suspended ceiling
  • Kitchen cabinets
  • Kitchen countertop
  • Bathroom cabinets
  • Plumbing of the 1st class
  • Shower cabin of the 1st class
  • Underfloor heating
  • Gas heating

The complex's infrastructure and comfortable spaces will make your daily life easier. Playgrounds filled with the joyful smiles of your children, sports activities and cozy green areas will provide a pleasant pastime for the whole family.

Infrastructure:

  • Landscaped landscaped territory
  • Garden, landscape design
  • Outdoor swimming pool
  • Aquapark
  • Sunbathing and relaxation area
  • Fitness room
  • Turkish bath (hammam) and sauna
  • Children's playground
  • Gazebos
  • Barbecue area
  • Basketball court
  • Generator
  • Open/closed parking
  • Closed fenced area
  • 24-hour security and video surveillance

Construction start date: 30.07.2023
Completion date of construction: 30.06.2025

Interest-free installments until the end of construction. Initial payment - from 50%.