Add listing Log in

Complex Gen Deluxe Palm 2

Gen Deluxe Palm 2 is a new premium residential complex with all amenities in Gazipasa, close to all infrastructure and beaches.
ID: 4854

Complex parameters

Stage of construction
construction
Levels totally
6
Destination to the sea
2,8 km

Detailed description

Gen Deluxe Palm 2 is a new premium class residential complex located in the promising and actively developing Mediterranean city of Gazipasa. A great option for investment, recreation and year-round living. 

Gen Deluxe Palm 2 will be located just 500 m from the main infrastructure of the city. The distance to the sea is 2800 m. Walking through the park area towards one of the best beaches in Alanya, you can enjoy the beautiful views and clean mountain air. 

The total area of the Gen Deluxe Palm 2 is 3768 sq. m. One 6-storey block with hotel-type infrastructure will be located on the closed site. The complex includes 76 apartments of 1+1 and 2+1 duplex layouts, with sea and mountain views.

Apartment layouts and areas:

  • 1+1 apartments with a total area of 46-47 sq. m. (consist of a corridor, a kitchen-living room, a bedroom, a bathroom and a balcony)
  • Apartment 2+1 duplex, with a total area of 100 sq. m. (consists of a corridor, a kitchen-living room, two bedrooms, a bathroom, a balcony and a terrace)

The apartments will be fully finished using high-quality premium materials and classic design. The price of the apartment also includes a kitchen set with niches for household appliances, fully equipped bathrooms, spot lighting and outputs for the air conditioning system.

Infrastructure of the complex:

  • Tropical garden, landscape design
  • Outdoor swimming pool
  • Children's pool
  • Pool bar
  • Gym
  • Indoor swimming pool
  • Sauna
  • Hamam
  • Roman steam room
  • Children's playground
  • Tennis court
  • Volleyball court
  • Basketball court
  • Gazebo
  • Barbecue
  • Backup generator
  • Outdoor parking
  • 24/7 security and video surveillance
  • Transfer to the beach

Start of construction: 30.03.2023
Completion of construction: 12/30/2024

You can apply for an interest-free installment plan until July 2024. The initial payment is 50%.