Last update 01-10-2024 views: 312
Property parameters
Location
Property options
Detailed description
Total in the complex: 322 corner apartments
121 double-sided apartments
102 apartments with private garden
In most buildings there are from 2 to 4 apartments per floor.
All technical details have been thought out during the construction of the complex:central air conditioning, underfloor heating, built-in air purifiers, the highest quality materials are used in the apartments, as well as in common areas, while each apartment will have a ceiling height of 2.85 3.20 meters. Geothermal heat pumps will be installed as a source of heating and cooling, which is one of the cleanest, as well as one of the most cost-effective energy sources.
Air purifiers that will include HEPA filters, as well as activated carbon filters, so that the air inside the apartments can be cleaned of harmful particles, bacteria and allergens, as well as unpleasant odors.
Sound insulation is above the standards currently in place in Belgrade.
A private real estate management company will be created.
Apartments from one bedroom to four with high ceilings are available in various layouts and sizes suitable for any lifestyle: from apartments with an area of 48 sq. m., to residences with an area of 320 sq. m. for those who need the most spacious rooms.
The price range within the project will be from 4,800 euros/sq.m to 6,000 euros/sq.m, and in stage 2 - up to 8,400 euros/sq.m, including VAT, and standard garage spaces will cost from 33,000 to 42,000 euros, including VAT.
The price difference will depend on the type (proximity to the river, height and orientation), and the quality of the construction will be the same and correspond to the information we have already provided.
The first phase will include 7 buildings next to the future Linear Park, and the second phase will include the "Wave" building and 3 buildings next to the river, and reservations are underway for both phases. The construction permit for the first phase has already been received, and delivery is scheduled for the fourth quarter of 2026, the construction permit for the second phase is expected in the fall of next year, and delivery is scheduled for the fall of 2027.

Subscribe to newsletter similar properties